New Saint Brigid’s residence project ‘delayed’ with infrastructure costs rising Peter Black, Local Journalism Initiative reporter peter@qctonline.com The project to build a brand new Saint Brigid’s care home is on…
New Saint Brigid’s residence project ‘delayed’ with infrastructure costs rising was last modified: February 21st, 2023 by
Saint Brigid’s Home, opened in the 1970s, does not meet current norms for long-term residential care centres. (Photo from CBC)